Wastewater Collection System Map
RH White Contract ($569,567.00)

Invoice 1 ($46,889.24)
Invoice 2 ($57,868.31)
Invoice 3 ($114,744.42)
Invoice 4 ($160,782.43)
Invoice 5 ($20,510.64)
Invoice 6 ($117,811.80)
RH White Letter 1/5/2017
2006 Ledyard Center Sewer Feasibility Study (Weston & Sampson)

Cover & Table of Contents
Introduction & Existing Conditions
Wastewater Flows
Evaluation of Alternatives
Conclusion and Recommendations
Figure 1
Figure 2 & 3
Figure 4
Figure 5, 6, &7
Appendix A & B
Apendix C
Appendix D
Appendix E

Bid 2016-07 Pre-Qualifications

Wiston Builders Corp.
C.H. Nickerson
G. Donovan
O&G Industries
R.H. White

8/19/2015 Bid #2016-02 Site Demolition

Mystic Air Report
Electrical Report

Bid Tabulation
Fuss & O' Neill Recommendation
Signed Contract ($69,500); Standard Demo: Invoice 1, Invoice 2
Pre-Construction Meeting Minutes

8/19/2015 Fuss & O'Neil

Signed Fuss & O'Neill Contract ($73,300 Engineering Services; $63,700 Construction Admin)
$136,000

Contract Amendment: TASK 2.3 FIELD SURVEY ($3,500)

Progress Meeting Minutes
May
June
July
August

Invoices
June ($6,868.50)
July ($14,649.50)
August ($11,938.00)
September ($5,041.00)
October ($9,985)
November ($6,972)
December ($6,077.00)
January ($7,058.00)
February ($12,326.00)
March ($9,262.00)
April ($4,717)
May ($6,249.00)
June ($4,631)
July ($6,370)
August ($4,459)
September ($4,459)
October ($2,548)
November ($2,548)

TOTAL: $119,151

2/17/2015 Qualifications Statements Bid#2015-09

Beta Group, Inc
CDR Maguire
Fuss & O'Neill
Wright-Pierce

7/29/2014 Presentation: Full Size (10.6 Mb) Reduced (1.4 Mb)
Audio of Hearing; Hearing Fact Sheet

Draft Waste Water Facilities Study (Revised To July 2, 2014)

Executive Summary
Table of Contents

Pages 1-51
Pages 52-105
Pages 106-159
Pages 160-

Revised (June) DRAFT Wastewater Facilities Management: Part 1 (11.6Mb); Part 2 (12.9 Mb)
Appendix D On-lot Sewer Management Ordinance
DRAFT Wastewater Facilities Management: Plan Part 1 (1.1Mb) Part 2 (11.2 Mb) Part 3 (4.6 Mb)

*January 11, 2011 added presentation to WPCA

*In December, 2009, as part of preparing a Wastewater Facilities Management Plan for Ledyard, the Maguire Group completed a "Phase 1: Review of Outlying Areas". This review has been accepted by CTDEP and the WPCA will have to decide are moving forward with Phase 2 of the study and on other issues/opprtunities identified

*Please note that these documents are for information only; the complete, official documents and files are available are the Town Hall, Town of Ledyard, 741 Colonel Ledyard Hwy., Ledyard, CT 06339.

DEEP Closing Statement w/ letter (5/10/2017)
DEEP Payment Requisitions 1; 2; 3; 4
DEEP Detail Report: 9/2014; Summary Report: 9/2014
WPCA Alternatives Rev
201Phase II Figure Rev
Report of Meeting (2/15/2012)
Drawings From Meeting: Figures: 1, 2, 3, 4, 5, 6, 7, 8
Report of Meeting (10/25/2011)
2009 Ledyard Center Committee Report
Potential Package Treatment Sites Ledyard Center
2006 Baldwin Hill Road Layout
2006 Industrial Park Presentation
2006 Industrial Park Supplemental Presentation
2006 Groton Ledyard Interconnect Presentation
Maguire Group contract (Phase 2)
CTDEEP Engineering Aprroval Letter (8/3/2011)
Ledyard Center Sewer Feasibility Study (9/2006) (14±Mb)
Baldwin Hill Industrial Park Sewer Feasibility Study (9/2006) 14± Mb)
Wastewater Facilities Management Plan Phase 1 Review of Outlying Areas 9/29/2010
DEP Approval Letter 11/24/2010
Wastewater Facilities Management Plan, Phase 1, December 15, 2009, Maguire Group (1.4 Mb) (without drawings)
Clean Water Fund Status and Information
Report of Meeting 11-15-2010
Abridged Presentation for Jan 11, 2011 WPCA Meeting PDF; PowerPoint

2001 Tri-Committee: Development of Route 12

The report has been broken into sections:

Part 1
Part 2
Part 3
Part 4
Part 5
Part 6

Route 12 Corridor Study (UCONN)

Part 1
Part 2
Part 3

1998 Mullin Plan

In 1998 the Economic Development Commission worked with Mullin Associates, Inc to develop an economic development strategy for Ledyard. This was a comprehensive study and much of it remains relevant today.