LEDYARD, CT

Planning & Development Information - Ledyard Police Facility

Last Updated: July 21, 2016

Field Reports

#1 - 8/28/2015
#2 - 9/4/2015
#3 - 9/11/2015
#4 - 9/18/2015
#5 - 9/25/2015
#6 - 10/2/2015
#7 - 10/9/2015
#8 - 10/16/2015
#9 - 10/23/2015
#10 -10/30/2015
#11 -11/6/2015
#12 -11/13/2015
#13 -11/20/2015
#14 -11/27/2015
#15 -12/4/2015
#16 -12/11/2015
#17 -12/18/2015
#18 -12/23/2015
#19 -1/8/2016
#20 -1/15/2016
#21 -1/22/2016
#22 -1/29/2016
#23 -2/5/2016
#24 -2/12/2016
#25 -2/19/2016
#26 -2/26/2016
#27 -3/4/2016
#28 -3/11/2016
#29 -3/18/2016
#30 -3/25/2016
#31 -4/1/2016
#32 -4/8/2016
#33 -4/15/2016
#34 -4/22/2016
#35 -4/29/2016
#36 -5/6/2016
#37 -5/13/2016
#38 -5/20/2016
#39 -5/27/2016
#40 -6/3/2016
#41 -6/10/2016
#42 -6/17/2016
#43 -6/24/2016
#44 -7/1/2016
#45 -7/8/2016
#46 -7/15/2016

Clerk of Works Proposals

Construction Solutions Group
Stephen Shuttleworth, PDF Version (submitted as PPT)
Colliers International
Whiting-Turner
Crec
Stadia

January 13, 2015

Curtain Drain Contract

December 11, 2014

Curtain Drain Invitation to Bid; Link to documents

December 5, 2014

LLD Conditional Review (12/5/2014)

11/17/2014 Plan Set (Large Files 2+Mb): Sheet 1, 2, 3, 4, 5, 6, 7, 8

Draft Specifications & Drawings Curtain Drain Installation (11/29/2014)

May 6, 2014

Contractor's Demolition Plan

April 8, 2014 Planning & Zoning Submission Drawings

Cover
Demolition Plan
Site Improvement Plan
Site Grading Plan
Site Utility Plan
Site Lighting Plan
Site Planting Plan
Site Details-1
Site Details-2
Site Details-3
Alternate Site Details
Site Drainage Plan
Site Drainage Details
Architectural Elevations

2/4/2014

Pre-demolition Survey 737 COL
Pre-demolition Survey 737R COL
Pre-demolition Survey 741R COL
Mechanical System Report

New 1/30/2014
Deep Test Pit Memo
Site Existing Conditions
Parking Memo (11/2012)
Preliminary Septic Plan
Preliminary Site Plan
Preliminary Site Plan Without Additional Property
Site Plan without Plantings
Site Plan Option 3
Town Hall Survey updated 1/27/2014

Geotechnical Engineering Investigation (1/8/2014)
Mystic Air Purchase Order
1/2/2014 email concerning soil borings
12/31/2013 Mattern & Stefon Invoice
12/31/2013 Email Concerning Survey updates

Architect's Contract; Sketch Concepts: Existing Conditions; S1; S2; Current Survey

Topographic survey, Utility & Topo (11/27/2013)

Historical Survey & Documents

1987 Town Hall Renovations w/water line notes

1999 EMS Building Plans (Not Constructed) S1; S2; S3; S4

Septic Sketch: Town Hall; Annex; Ambulance

1977 Town Hall Annex

1964 Town Hall Addition

Site Developement Plan (full size)

Elevations (full size)

Space Needs Assessment
Detailed Cost Estimate-737 Colonel Ledyard Highway

Detailed Cost Estimate-881 Colonel Ledyard Highway

Cost Estimate- 7 Hurlbutt Road
Presentation (PDF)

Space Function Floor Plan (full size)

Schematic Floor Plan (full size)